A painting estimate is useful only when you can see what the total buys. This worksheet keeps three proposals beside the same project requirements so differences in surfaces, preparation, products, responsibilities, payments, exclusions, and closeout are easier to identify before a contract is signed.

Make every estimate describe the same project

Start with one written project list and give it to every company. A lower total may simply omit a ceiling, door, repair, primer step, second coat, difficult access area, or protection responsibility that another proposal includes. The comparison becomes meaningful only when each estimate responds to the same rooms, elevations, surfaces, and expected finish.

  • List every room, elevation, component, and surface
  • Record known repairs and areas that need separate evaluation
  • Use the same color-change and finish assumptions
  • Identify occupied-space, access, pet, parking, and schedule limits
  • Ask each company to mark exclusions instead of leaving blanks

Break the total into visible scope

Look past broad labels such as interior painting or exterior repaint. The proposal should explain cleaning, scraping, sanding, patching, caulking, masking, priming, coating, cleanup, and disposal where those steps apply. It should also state the product line, sheen, included surfaces, and any assumptions that could change the price.

  • Compare preparation and repair language line by line
  • Record primer and coat-system assumptions
  • Confirm the product line, color code, and sheen for each surface
  • Identify owner-supplied materials or preparation
  • Ask how concealed or unexpected conditions will be documented

Separate included work from possible additions

An estimate cannot predict every concealed condition, but it can explain what is included, what is excluded, and how additional work is approved. Pay attention to allowances, quantity limits, access assumptions, material upgrades, drywall or wood repair limits, association requirements, permits, and specialist trades that may sit outside the quoted total.

  • Write down every allowance and quantity limit
  • List software, permit, material, disposal, or specialist costs that are separate
  • Confirm whether repairs have a defined limit or unit price
  • Require written approval before additional work begins
  • Do not treat an unanswered line as included

Compare payment, communication, and closeout

The strongest proposal is not automatically the lowest or highest. It is the one that makes the project easiest to understand and administer. Compare deposit and progress-payment stages, estimated timing, communication contacts, written-change procedures, walkthrough expectations, product records, cleanup, and any written care or warranty terms that are actually offered.

  • Connect payments to understandable project stages
  • Identify who can approve scope and price changes
  • Use one written communication path for decisions
  • Define the final walkthrough and punch-list process
  • Keep the selected proposal, changes, receipts, colors, and product records together

Printable worksheet

Compare three estimates beside the same requirements

Type directly into the fields, then print or save the completed page as a PDF. Entries stay in this browser page and are not sent to Superior.

Painting estimate comparison worksheet
What to compareProposal AProposal BProposal C
Company and price
Company and contact
Proposal date and expiration
Total quoted price
Deposit and payment stages
Estimated start and duration
Included scope
Rooms, elevations, and surfaces
Cleaning and surface preparation
Patching, caulking, and repairs
Primer and coat system
Doors, trim, ceilings, cabinets, or extras
Products and finish
Product line and manufacturer
Color codes and sheen
Material and quantity assumptions
Owner-supplied items
Drying, cure, and access limits
Responsibilities and changes
Furniture, landscaping, and property protection
Access, water, power, parking, and pets
Cleanup and disposal
Exclusions and possible additional costs
Written change-order process
Verification and closeout
Business and applicable credential checks
Insurance or project documents requested
Project examples or references reviewed
Walkthrough, punch list, and final payment
Unanswered questions and final notes

Official sources

Verify the records that apply to the work

These public tools answer different questions. Check the legal entity, then verify any state license, local registration, permit, or insurance requirement that applies to the actual scope and jurisdiction.

Use this guide as a conversation tool

A checklist cannot diagnose a hidden condition or define a final scope. It can help you ask better questions, compare written proposals, and keep decisions from disappearing into memory.

Discuss a project